#1100012Condensate pump installationunit
#1100011 · Air conditioning and ventilation
Condensate drain line (m)
Condensate drain line (m): routing and fastening the specified line along the agreed path; marking and alignment check of the installed element; any work outside this scope is agreed separately.
Included
- Routing and fastening the specified line along the agreed path
- Marking and alignment check of the installed element
Excluded
- Cost of the item, spare parts and consumables
- Drilling, coring or chasing the substrate
- Restoration of plaster, finishes or tiling
Conditions
- Quantity is based on actual completed metres, square metres or units
- Work area must be accessible without specialist lifting equipment
Scope is a catalog definition; exact conditions and extras are agreed before work.
Related services
Add extra work if needed. Check that it is not already included in the main service.
Alternative options
Choose a suitable option instead of the current service when specifications differ.
Price · tbilisi
10.00 ₾
m
Final prices are confirmed by an operator. Materials and travel may cost extra.