#1800020 · Finishing and construction
Construction waste removal (trip)
Construction waste removal (trip): loading and hauling the agreed debris volume in one trip; any work outside this scope is agreed separately.
Included
- Loading and hauling the agreed debris volume in one trip
Excluded
- Cost of the item, spare parts and consumables
- Removal of previously installed equipment
Conditions
- Work area must be accessible without specialist lifting equipment
- Quantity is based on actual completed metres, square metres or units
Scope is a catalog definition; exact conditions and extras are agreed before work.
Price · tbilisi
400.00 ₾
trip
Final prices are confirmed by an operator. Materials and travel may cost extra.